Government Tender Information Online | Private and Public E- Tenders in Europe and Asia | Israel Export
Advanced Search
Home » Tenders by Product » Locks Tenders

508 - Document matches your request
showing 1 - 10
Page 1 - 51
  • Show
  • Tenders per page

Location Date Summary Deadline
Asia, Asia Pacific21-Nov-2024Supply Of Lock For Transition And Non Transition Cbc
Lock For Transition And Non Transition Upgraded High Tensile Cbc Aar Type 'e' For Freight Stock To Drawing No.rdso Sk. 62724, Alt. 31,item 8 And To Rdso Spec. No. Wd-70-bd-10, Rev.3 Of May 2022 [.
24-Dec-2024
Asia, Asia Pacific21-Nov-2024Supply Of Rotary Lock Lift To Sanrok Drg. No. 1ed-1074
Rotary Lock Lift To Sanrok Drg. No. 1ed-1074 Make- Sanrok ( Warranty Period : 30 Months From The Date Of Supply) [ Warranty Period: 30 Months After The Date Of Delivery ] ].
27-Nov-2024
Asia, Asia Pacific21-Nov-2024Supply Of Double Rotary Lock Lift Assembly Of Frontier Make
Double Rotary Lock Lift Assembly Of Frontier Make Aar "h" Type Tight Lock Cbc For Passenger Coaches Drawing No.: Frontier Part Drg. Fasl/tlc/dr/0471 Matl. & Spec. : Rdso Spec. No. Rdso/2011.
27-Nov-2024
Asia, Asia Pacific21-Nov-2024Supply Of Godrej Nav-tal 6 Lever, Ultra Xl, 8 Levers & Ultra Xl Common Keys Brass Body Locks For Use In Various Departments Of Ttd, For The Year 2024-25..
11-Dec-2024
Asia, Asia Pacific21-Nov-2024Supply Of Lock Parallel And Thickness Gauge As Per Drg. No. Wd-84073- S-59- Rc.
Lock Parallel And Thickness Gauge As Per Drg. No. Wd-84073- S-59- Rc. The Gauge Must Be Supplied With Calibration Certificate. [ Warranty Period: 30 Months After The Dat.
26-Nov-2024
Asia, Asia Pacific21-Nov-2024Supply Of Brake Shoe, Shackle Assy, Fuel Pipe, Door Mirror, Water Separator Filter Assy, Bonet Lock, Bonet Cable, Tie Rod End, Hose Clamp, Door Inner Handle
qty:49
.
11-Dec-2024
Asia, Asia Pacific21-Nov-2024Supply Of Pwi Tool Kit
Export Quality Pwi Tool Kit Model Tk-1 For Rgm Consisting Of Following Items 1. Clearance Gauge Bg 2. Shim Feeler Gauge 3.stepped Feeler Gauge 4.tapered Gauge . 5.gap Gauge. 6.rail Thermometer Similar To Model Mfmbt-a 7.pair O.
02-Dec-2024
Asia, Asia Pacific21-Nov-2024Supply Of Clamp Point Lock 60kg
Clamp Point Lock 60kg (for Thick Web Switch) For B.g. Complete Set Of Assembly As Per Rdso Drawing No.rdso/s 3395a, Alt-1 Of (main Drawing Rdso/s 3454 Alt-b). [ Warranty Period: 30 Months After The Date Of Delivery ].
02-Dec-2024
Asia, Asia Pacific21-Nov-2024Supply Of Uncoupling Gear Arrangement
Uncoupling Gear Arrangement Of Wagons (i.e To Be Supply Only Locking Arrangement Of Uncoupling Rod As Mentioned In (7) Authority: Wd-22025, Date:03/22) As Per Rdso Drg. No.wd-00046-s-01. [ Warranty Period: 30 Mo.
02-Dec-2024
Asia, Asia Pacific21-Nov-2024Supply Of Dp Box With Combat Vinyl Print, Power Cord, Charger Adapter, Acrylic Box With Lock, Vinyl Printed Acrylic Box, Solar Panel, St For Solar Panel, N Type To Bnc Connector, Sma Male To Bnc Male Rf Cable, Router Gl I Net, Router, Sc To Sc Fibre Pickt.
11-Dec-2024
  • Show
  • Tenders per page

User Id 
Password
 Forgot password?