Home
|
Services
|
Contact Us
Home
»
Contract Awards by Sector
» Minerals and Mining Contracts
111 - Document matches your request
showing 1 - 10
Page 1 - 12
Show
10
25
50
Contracts per page
Location
Date
Summary
Deadline
Europe
06-Dec-2025
Contract Awarded For Delivery Of Special Sidewalk Enclosure Doors For The Polish Mining Group S.a. Branch Kwk Sosnica As Part Of Consignment Stocks - Group Number 281-10. delivery Of Special Sidewalk Enclosure Doors For The Polish Mining Group S.a. Branch.
N.A.
Asia, Asia Pacific, APEC Countries
06-Dec-2025
Contract Awarded For rfp Consultation Service For Just Transition Pathways For The Coal Mining Sector In The Philippines Contract Value (usd) 149983.00 Award Date 05-dec-2025.rfp Consultation Service For Just Transition Pathways For The Coal Mining Sect.
N.A.
Asia, Asia Pacific
06-Dec-2025
Construction Of 22 Nos. Rcc Isolation Stoppings In Cm Panel No. 34d, 39d, 40r, 34r And 34lsa Dep. Panel Of 10b (top) Seam At Haldibari Ug Mine..
N.A.
Asia, Asia Pacific
06-Dec-2025
Construction Of 33 Nos. Of 50cm Thick Isolation Stopping To Isolate -39 Dip, 28ls And 24ls Proposed Lhcm Panel In Seam C At Kurja Ug Mine Of Hasdeo Area..
N.A.
Asia, Asia Pacific
06-Dec-2025
Construction Of 32 Nos Rcc Sectionalization Stopping To Isolate Development Panel In Seam-c (30nos) And Seam D (02nos)at Bijuri Colliery Of Hasdeo Area.
N.A.
Asia, Asia Pacific
06-Dec-2025
Construction Of 46 Nos Pcc Ventilation Stoppings In 15ln And Main Dip Panel Of Seam A At Kurja Ug Mine..
N.A.
Asia, Asia Pacific
06-Dec-2025
Installation Of 07 Nos. Haulage And Laying Of Haulage Track Line And Line Packing Including Packing With Materials For Cm Panel No.27d And 27r Depillaring Panel Of 4a Seam At Haldibari Ug Mine..
N.A.
Asia, Asia Pacific
06-Dec-2025
Construction Preparatory Of Of Epi Stopping At E9 Tg And Bg Of Xvi(b) Seam 500mh At Moonidih Colliery W.j Area . #*. Construction Of Preparatory Of Epi Stopping At E9 Tg And Bg Of Xvi(b) Seam 500mh At Moonidih Colliery W.j Area . Construction Preparatory.
N.A.
Asia, Asia Pacific
06-Dec-2025
Crack Filling Over Subsidence Area Of 10ls(a),10ls(b),10ls(c), 11ln/29dn, 11ln(a),cm Panel No 2, Cm Panel No 4, 61ls,58ls,57ls, Cm Panel No 3, 57ln And 53ln Depillaring Panel Lws At Tawa Ii Mine, Pathakhera Area, Wcl.
N.A.
Asia, Asia Pacific
06-Dec-2025
Rep. Of Tata Hitachi Si No. 182 And 195..
N.A.
Show
10
25
50
Contracts per page
Sub Sector From Minerals and Mining
Minerals and Mining (391)
New User
Subscribe Now
Members Login
User Id
Password
Forgot password?