Government Tender Information Online | Private and Public E- Tenders in Europe and Asia | Israel Export
Advanced Search
Home » Tenders by Product » Aluminium tubes, pipes and tube or pipe fittings Tenders

869 - Document matches your request
showing 1 - 10
Page 1 - 87
  • Show
  • Tenders per page

Location Date Summary Deadline
Asia, Asia Pacific07-Nov-2026Annual Repair, Colony, Maintenance, Repair And Renovation Of Changeover Quarters And Day To Day Maintenance Of Water Supply Complaints And Water Supply Fittings Of Combined Township Of Saoner Sub Area. (for 02 Years).
25-Nov-2026
Asia, Asia Pacific07-Nov-2026Tender Invited For 2inch Gal_elbow 45, Scrf,10inch Elbow 90, Bw, Std,,12inch Elbow 90, Bw, Std,,20inch Elbow 90, Bw, S ##quantity: 2305 ##.
18-Nov-2026
Asia, Asia Pacific07-Nov-2026Set Of Two Items For Acp Isolating Cock Set Of Two Items For Acp Isolating Cock relocating Modification In Lhb Coaches Consisting Of Following: (1) Street Elbow 1 bsp(f) X 1 Bspt(m) To Icf Drg No. Icf/std 3-5-129 Alt A Or Latest Item No.-4, Qty.- 1 nos. P.
27-Nov-2026
Asia, Asia Pacific07-Nov-2026Prc E M Items Switch Socket Combination 15/16 Amps, Switch Socket Combination 3 Pin 16 Amps Multiporpose Flush Type, Switch Socket Combination 3 Pin 5/6 Amps Multipurpose Flush Type, S/s Comb 5 Pin 6 Amp With Gang Box, Pvc Gang Box Suitable For Switch Soc.
21-Nov-2026
Asia, Asia Pacific07-Nov-2026Procurement Of P22 Pipes And Elbows For Tmd For Brbcl.
20-Nov-2026
Asia, Asia Pacific07-Nov-2026Tender Invited For Clutch Fan Assy,fuel Relay,eng Mounting Pad,clutch Plate,pilot Bearing,bonet Cable,stering Universa ##quantity: 20 ##.
17-Nov-2026
Asia, Asia Pacific07-Nov-2026Tender Invited For Cs, Ss & G&t Erw Pipe Fittings ##quantity: 1 ##.
17-Nov-2026
Asia, Asia Pacific07-Nov-2026Provision For Network Improvement With Installation Of Isolation Valve, Interconnection Work, Dedicated Header Lines And Manifold Arrangements With Automation And Instrumentation Work At Maitribihar, Bhubaneswar.
20-Nov-2026
Asia, Asia Pacific07-Nov-2026Dismantling And Fixing-back Of Pipelines And Fittings For Choke Clearing At Np Plant, Fact Cd
Dismantling And Fixing-back Of Pipelines And Fittings For Choke Clearing At Np Plant, Fact Cd.
23-Nov-2026
Asia, Asia Pacific07-Nov-2026Machining Of 60 Lines Established Components With Hal Material Plug, Washer, Nut, Housing, Ring, Casing, Pump Cover, Cover, Cup, Flange, Air Swirler, Frame, Bush, Connecting Pipe, T-joint, Fixator, Nozzle, Thrust Support, Gear, Stock, Piston, Union, Angle.
17-Nov-2026
  • Show
  • Tenders per page

User Id 
Password
 Forgot password?