Government Tender Information Online | Private and Public E- Tenders in Europe and Asia | Israel Export
Advanced Search
Home » Tenders by Product » construction work for railway viaduct Tenders

14 - Document matches your request
showing 1 - 10
Page 1 - 2
  • Show
  • Tenders per page

Location Date Summary Deadline
Asia, Asia Pacific, APEC Countries26-Apr-2024Design And Construction Of Rail Viaduct Link Between Tuas West Extension And Singapore Rail Test Centre.
23-Jul-2024
Asia, Asia Pacific22-Apr-2024Design And Construction Of Elevated Metro Viaduct Reach 2b, Reach 3a And Reach 4a Of Nagpur Metro Project Phase Ii..
09-May-2024
Asia, Asia Pacific22-Apr-2024Design And Construction Of Elevated Metro Viaduct For Nmrp Phase-2 In: I.between Ch (-) 7577.056 M To Ch (-) 13457.046 M Of Length 5.9 Km In Reach 2b Ii.between Ch: 18218.586 M To Ch: 24633.194 M Of Length 6.414 Km In Reach-3a Iii.between Ch: (-) 289.668.
09-May-2024
Asia, Asia Pacific03-Apr-2024Agent Central Region Engineering Branch Office,railway Bureau,motc. "taichung Railway Viaduct Detect Technical Services".
07-May-2024
Asia, Asia Pacific19-Apr-2024Maintenance of 11 nos. Metro Stations, 11.1 Km Viaduct & Taloja Depot and Two Receiving Sub Stations (R.S.S.) of Navi Mumbai Metro Line..
09-May-2024
Asia, Asia Pacific22-Mar-2024Design And Construction Of Elevated Metro Viaduct Reach 2b, Reach 3a And Reach 4a Of Nagpur Metro Project Phase Ii..
02-May-2024
Asia, Asia Pacific21-Mar-2024Miscellaneous Civil Works And Annual Maintenance Contract For Civil Works Of Orange Line From Aiims To Subhash Nagar Stations Including Viaduct And Depot For Bhopal Metro Rail Project.
07-May-2024
Asia, Asia Pacific15-Mar-2024Design And Construction Of Elevated Metro Viaduct For Nmrp Phase-2 In: I.between Ch (-) 7577.056 M To Ch (-) 13457.046 M Of Length 5.9 Km In Reach 2b Ii.between Ch: 18218.586 M To Ch: 24633.194 M Of Length 6.414 Km In Reach-3a Iii.between Ch: (-) 289.668.
02-May-2024
Asia, Asia Pacific19-Apr-2024Engagement of DDC for Arch. and BS incl. E and M Traction works and CW for Depot and OCC building including proof checking of substructure for viaduct, special span including its superstructure and stations for Bhubaneswar metro rail project of BMRC.
30-Apr-2024
Asia, Asia Pacific13-Mar-2024Design And Construction Of Elevated Metro Viaduct For Nmrp Phase-2 In I. Between Ch (-) 7577.056 M To Ch (-) 13457.046 M Of Length 5.9 Km In Reach 2b Ii. Between Ch 18218.586 M To Ch 24633.194 M Of Length 6.414 Km In Reach 3a Iii. Between Ch (-) 289..
02-May-2024
  • Show
  • Tenders per page

User Id 
Password
 Forgot password?