Government Tender Information Online | Private and Public E- Tenders in Europe and Asia | Israel Export
Advanced Search
Home » Tenders by Product » Concrete pipes and fittings Tenders

101 - Document matches your request
showing 1 - 10
Page 1 - 11
  • Show
  • Tenders per page

Location Date Summary Deadline
Asia, Asia Pacific06-May-2024Providing And Laying In Position Specified Grade Of Reinforced Cement Concrete, Excluding The Cost Of Centering, Shuttering, Finishing And Reinforcement - All Work Up To Plinth Level : 1. 1:1.5:3 (1 Cement : 1.5 Coarse Sand (zone-iii): 3 Graded Stone Aggr.
15-May-2024
Asia, Asia Pacific06-May-2024Earth Work In Excavation By Mechanical Means (hydraulic Excavator)/manual Means Over Areas (exceeding 30 Cm In Depth, 1.5 M In Width As Well As 10 Sqm On Plan) Including Getting Out And Disposal Of Excavated Earth Lead Up To 50 M And Lift Up To 1.5 M, As.
14-May-2024
Asia, Asia Pacific06-May-2024Khanak Block: Tosham Panchayat: Khanak Dist.: Annual Mtc. Work For Water Supply 1 Miscellaneous Items/ Misc. Items Joint Repair. / Job Work For Rcc Np2 Pipe 450mm Joint Repair Including Material Cement, Sutli, Cruser With Labour Complete In All Respect..
07-May-2024
Asia, Asia Pacific06-May-2024Supply Of Ismc 150 Channel , Ms Angle 65 , Ismb 150 Beam , Ms Plate 8mm Thick , Ismc Channel 150..
18-May-2024
Asia, Asia Pacific06-May-2024Providing Lowering Cutting Jointing And Testing Rcc Pipe Class Np3 As Per Is-458-2003 With Spigot And Socketed Joints Manufactured With Isi Marked Sulphate Resistance Cement As Per Isi 12330 With Rubber Rings Isi Marked Antiternmite As Required At Site In.
15-May-2024
Asia, Asia Pacific06-May-2024Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering - All Work Below Plinth Level And Up To Floor Iv Level: 2. 1:2:4 (1 Cement : 2 Coarse Sand (zone-iii) : 4 Graded Stone Aggregate 20 Mm Nomin.
15-May-2024
Asia, Asia Pacific06-May-2024Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering - All Work Below Plinth Level And Up To Floor Iv Level: 2. 1:2:4 (1 Cement : 2 Coarse Sand (zone-iii) : 4 Graded Stone Aggregate 20 Mm Nomin.
14-May-2024
Asia, Asia Pacific06-May-2024Supply Of Precast Concrete Pipes (with Without Reinforcement) (v2) As Per Is 458 (latest) (q2). Qty : 90.
14-May-2024
Asia, Asia Pacific06-May-2024Supply Of Hollow Solid Concrete Blocks As Per Is 2185 (q3) Qty : 5000.
15-May-2024
Asia, Asia Pacific06-May-2024Supply Of Precast Concrete Pipes (with And Without Reinforcement) (v2) As Per Is 458 (q2) Qty : 60.
20-May-2024
  • Show
  • Tenders per page

User Id 
Password
 Forgot password?