Home » Contract Awards by Region » Asia Pacific Contracts

362731 - Document matches your request
showing 1 - 10
Page 1 - 36274
  • Show
  • Contracts per page

Location Date Summary Deadline
Asia-pacific-090010425-Apr-2024Supply Of Sensor S/a #*. Sensor S/a , Medha Part.no. Sp813400003 , Make: Medha [ Warranty Period: 30 Months After The Date Of Delivery ].
N.A.
Asia-pacific-090010425-Apr-2024Supply Of Flexible Polyamide Corrugated Conduit Of [flexible Polyamide Corrugated Conduit Of Normal Size-nw-36, Conforming To Rdso Specification No. - Rdso/pe/spec/ac/0138-2009(rev.-1) Note- To Be Procured From Railway Approved Sources. ] #*. Flexible Pol.
N.A.
Asia-pacific-090010425-Apr-2024Supply Of Design,printing #*. High Pressure Oil Injector Pump, Part No. Se/so1/130 Of 130 Dia Hydraulic Extractor For Dismounting Of The Bearing, Model No. Siloman/be/130-140; Working Pressure 700 To 1000 Kg/cm 2 [ Warranty Period: 30 Months After The Dat.
N.A.
Asia-pacific-090010425-Apr-2024Supply Of Flush Switch #*. Flush Switch (dual) Complete Ofves13000-1. Accepted Make/brand: Firm S Own Make [ Warranty Period: 30 Months After The Date Of Delivery ].
N.A.
Asia-pacific-090010425-Apr-2024Supply Of Roller Bearing #*. Roller Bearing No.pe/rb 5020, M/s Nei Drg. No. X-207(rev.-nil) Part No. 21 Or Fag(schaeffler) Drg.no.901-20-101 Version-ab Or Latest, Part No. 21, Roller Bearing No. Wuz-150 X 270 M1c4 For Axle Box Of Wag-7 / Wap-4 Loco. [ War.
N.A.
Asia-pacific-090010425-Apr-2024Supply Of Jop Card For Wsp #*. Jop Card For Wsp Of Lhb Coaches Escorts To Drg. No. 3eb 8242/4, Make-escorts. [ Warranty Period: 30 Months After The Date Of Delivery ].
N.A.
Asia-pacific-090010425-Apr-2024Supply Of "thermal Magnetic Motor Circuit Breaker #*. "thermal Magnetic Motor Circuit Breaker 3 Ph, 415v, Rated Current 4a, Duty Ac3, Current Setting Shall Be 2.4-4a, With 32mm Din Rail Mounting Facility, Single Phase Preventaing Thermal Overload & Short.
N.A.
Asia-pacific-090010425-Apr-2024Supply Of Set Of Rail Guard Assembly For Wag-9/wap-7 Locomotive.set Consists Of 02 Nos. #*. Set Of Rail Guard Assembly For Wag-9/wap-7 Locomotive.set Consists Of 02 Nos.( 01 No. Rh &01 No. Lh), As Per Clw Drawing No. 1209.02.440.044, Alt-2. [ Warranty Per.
N.A.
Asia-pacific-090010425-Apr-2024Supply Of Pantograph Mounting Insulator #*. Pantograph Mounting Insulator As Per Clw Drg.no.clw/es/sk-4/ac/i-1 Alt.-k And Confirming To Clw Specification Clw/es/ac/i-1 Alt.-k. [ Warranty Period: 30 Months After The Date Of Delivery ].
N.A.
Asia-pacific-090010425-Apr-2024Supply Of Micro Processor #*. Micro Processor Based Energy Cum Speed Monitoring Unit For 3 Phase Electric Locomotive As Per Rdso Specn.no.elrs/spec/spm/0002 June,2004 With Amendment No.6(for Clw) (model:telpro-el,dialrange 0-180 Kmph) Aal Part No.34000010.
N.A.
  • Show
  • Contracts per page


Countries From Asia Pacific



User Id 
Password
 Forgot password?